Teatro Zinzani

Teatro ZinZanni’s project to build a 285-seat dinner theater and 4-story 192-room hotel on Port property at Broadway and the Embarcadero is moving through the City’s approval process.  The site is now a 250-space triangular parking lot.

The building will fit within the existing 40-foot height limit.  Arriving patrons will use a recessed 80-foot long passenger loading zone on Broadway.  No new parking spaces will be provided, and 35 street parking spaces will disappear.  TZ will lease 50 parking spaces at 847 Front Street. The Vallejo Street right-of-way will be vacated. There will be a small privately maintained park at the north end.

Demolition of the parking lot and construction of the project are expected to begin in 2019, and construction time is estimated to be 22 months.  Construction hours will be 7AM to 5PM Mondays through Fridays, with “occasional” work on Saturdays. There will be no pile driving.

We will update you when construction begins!